Job Number NB001: The new batch of larch has been dressed thus allowing fitting of the rails and seats. This work should begin during Wk10.

Job Number NB002:  Aprons have been installed to Hog.  The hog, aprons and frames bevelled for the garboard plank(s) installation.  Both Garboard planks have been installed

Week9 (15)
Click for album