NB01 Is now the right way up with all it's top coats on. All internal items are in build or have been completed. NB01 requires it's top rail to be varnished. The seats and floorboards are being oiled and varnished before being fitted inside the hull.  The nameplates are at Douglas Seton, who is very kindly doing the sign writing.  Kebes and top rubbing rails still to be installed.
 
NB02 inside hull clean-up progressing well.

Week20
Click for album