NB01 (St Baldred):  All installation complete for this stage with Brass Keelband installed along with rubbing trims. Modification to the floorboards is still on-going but this work will be conducted at the harbour and will not put the boat out of service this week. 
 
NB02  The clean-up of the inside of hull is now almost complete and the larch top rails have been dressed and are ready for fitting.
Oars:  Oar numbers 3 4 and 5 are progressing at various stages, with painting commencing on at least one of them!